How to choose the right tradesperson

The right tradesperson can be the difference between a successful project and months of delays, extra costs and frustration.

It is tempting to choose the cheapest quote or the first tradesperson who can start. But price and availability do not necessarily tell you whether the company has the right skills, its affairs in order or the capacity to complete the project.

Before you decide, you should check the company, look into its experience, compare several detailed quotes and sign a written contract. Payment should follow the progress of the project, and you should know what documentation you will receive when the work is finished.

Here you get a complete checklist for choosing the right tradesperson - from the first enquiry to finished, inspected work.

In brief

  • Describe the job as precisely as possible.
  • Find at least three suitable tradespeople.
  • Check the organisation number with the Brønnøysund Register Centre (Brønnøysundregistrene).
  • Check trade qualifications and the relevant public registers.
  • Ask for references from similar projects.
  • Compare the content of the quotes, not just the total.
  • Clarify who will carry out the work and which subcontractors will be used.
  • Always use a written contract.
  • Do not pay for the whole project up front.
  • Tie payment to documented milestones.
  • Approve all changes and extras in writing.
  • Agree on what final documentation you will receive.
  • Be sceptical of cash payment and quotes that seem unrealistically low.
  • Document progress with photos and written communication.
  • Carry out a final inspection before the last payment.

How to choose a tradesperson - step by step

A safe selection process can be divided into seven steps:

  • Write a clear description of the job.
  • Find three to five suitable companies.
  • Check registration, qualifications and experience.
  • Ask for comparable quotes.
  • Clarify responsibilities, schedule and documentation.
  • Sign a written contract.
  • Pay according to agreed and documented milestones.

Take a little extra time before you choose. A thorough check at the start is usually far easier and cheaper than dealing with mistakes after the project has begun.

1. Describe the job before you contact tradespeople

It is hard to get a precise quote if all you write is "I want to renovate the bathroom" or "I need a carpenter".

Write a simple work description that explains:

  • What you want done
  • Which rooms or areas are involved
  • Whether anything is to be demolished or removed
  • Whether the floor plan is to be changed
  • Whether you have already chosen materials
  • Whether you are buying the materials yourself
  • When you want the work to start
  • When the work must be finished
  • Whether the home will be occupied during the work
  • Whether parking or access is difficult
  • Whether you know of any existing damage
  • Whether the project may require a building permit application

Attach photos, measurements, drawings and any product choices. The more information the tradesperson gets, the easier it is to assess the work and give a realistic quote.

Use the same description for all the companies. That makes the quotes easier to compare.

2. Find several suitable tradespeople

As a rule, get quotes from at least three companies. For large projects it may be sensible to contact four or five.

You can find tradespeople through:

  • Recommendations from friends and family
  • Marketplaces for trade services
  • Local companies
  • Industry registers
  • Suppliers of kitchens, windows or building materials
  • An architect, surveyor or other professionals
  • Previous projects in your neighbourhood

A recommendation is a good starting point, but should not replace your own checks. The company may have taken on new staff, its finances may have changed, or it may have taken on more projects than it has the capacity to handle.

So check the company yourself, even if it was recommended by someone you trust.

3. Check that the company exists

Always ask for the company's full name and organisation number.

Then search the Brønnøysund Register Centre's business register. There you can check, among other things:

  • Whether the business is registered
  • Legal form
  • Registered address
  • Industry code and activity
  • General manager and other roles
  • Whether the business is registered in the Register of Business Enterprises (Foretaksregisteret)
  • Whether the business is registered in the VAT Register (Merverdiavgiftsregisteret)
  • Whether the business has registered employees
  • Whether the company is being wound up or is bankrupt

The name and organisation number should be the same on the quote, the contract and the invoice.

Payment should also go to the company or payment solution named in the agreement. Be careful if you sign an agreement with one company but are asked to pay a private individual or a different business.

What if the company is not registered for VAT?

Not being registered in the VAT Register does not automatically mean the company is disreputable. A new or small business may be below the registration threshold.

If the company adds VAT to the invoice, however, it should be registered. Ask if the information does not match the quote or the invoice.

4. Check for the right trade qualifications

Different jobs require different skills. A tradesperson can be skilled in their own trade without being qualified to carry out every part of the project.

Ask for information about:

  • Trade certificate (fagbrev) or journeyman's certificate (svennebrev)
  • Master craftsman certificate (mesterbrev)
  • Relevant education
  • Courses and certificates
  • Experience from similar work
  • Who in the company has professional responsibility
  • Who will actually be working in your home
  • Which tasks are outsourced to others

A trade certificate shows formal qualifications in a specific trade. A master craftsman certificate involves further qualifications in areas such as professional management and running a business.

You can check people who use the master craftsman title in the public Master Craftsman Register (Mesterregisteret). A master craftsman certificate is a positive sign, but no single approval can guarantee that a particular project will be flawless.

5. Use the right register for the right type of work

There is no single public register covering all tradespeople. Some trades have their own requirements.

Electrician

All businesses that lawfully offer and carry out electrical work must be registered with active status in the Register of Electrical Contractors (Elvirksomhetsregisteret).

Check the specific business or sub-unit that will carry out the work in DSB's Register of Electrical Contractors. DSB, the Norwegian Directorate for Civil Protection, stresses that it is the customer's duty to check this.

It is not enough that the person who comes to your home calls themselves an electrician. The work must be carried out and documented through a registered electrical contractor.

When the work is finished you should receive, among other things, a declaration of conformity (samsvarserklæring). According to DSB, this documentation must stay with the electrical installation.

Plumber and wet rooms

For plumbing and wet room work, you should check:

  • Relevant trade certificate and experience
  • Experience with similar bathrooms or pipe systems
  • How the membrane and penetrations are documented
  • Who is responsible for the different trades
  • Whether the solution follows the relevant product instructions and requirements
  • What final documentation you will receive
  • Whether the company has liability insurance

A full bathroom renovation within the same unit is normally exempt from the building permit requirement, but the relevant requirements in the Building Technical Regulations (byggteknisk forskrift) apply. Work that breaks through a fire separation or affects several residential units may be subject to other requirements. See the Norwegian Building Authority's (Direktoratet for byggkvalitet) overview of work on bathrooms.

Carpenter and master builder

For work on load-bearing structures, extensions or other work that requires a building permit, you should check:

  • Trade certificate and relevant experience
  • Whether the company can take on responsibility in the building application process
  • Which areas of approval the company holds
  • Whether structural calculations are needed
  • Who is the responsible applicant (ansvarlig søker) and designer (prosjekterende)
  • How the work is quality-assured

Central approval (sentral godkjenning) is a voluntary scheme. It can be relevant when you assess a company, but the absence of central approval does not automatically mean the business lacks qualifications. You can search for approved enterprises at the Norwegian Building Authority.

Painter, floor layer and other trades

For work without a dedicated mandatory business register, you should put extra weight on:

  • Relevant trade certificate
  • Documented experience
  • References
  • Product knowledge
  • Written work description
  • Insurance
  • Documentation of the substrate
  • Clear complaint procedure

6. Look into experience from similar jobs

Ten years of experience is not necessarily relevant if the company has never done the type of project you are planning.

Ask for two or three references from jobs similar to your own. Ask the reference customer:

  • What kind of work did the company do?
  • Did the work start on the agreed date?
  • Did the company keep to the schedule?
  • Did the final amount match the quote?
  • Were extras agreed in advance?
  • How was the communication?
  • Was the work site kept tidy?
  • Did any faults or problems arise?
  • How did the company handle the problems?
  • Would the customer choose the same company again?

The most interesting thing is not whether everything went perfectly. Building projects can run into unforeseen conditions. What is often decisive is how the company communicated and solved the problems.

Ready to find a tradesperson?

Describe your job, compare quotes and pay securely through Fikso.

Find a tradesperson

Free to use · No hidden fees · Payout only after approval

7. Read reviews with a critical eye

Reviews can provide useful information, but should not be used on their own.

Look for:

  • Reviews from the last few months
  • Descriptions of specific jobs
  • Photos from completed projects
  • Whether several customers describe the same problem
  • How the company responds to criticism
  • Whether the reviews seem natural and varied
  • Whether the company has experience with your type of project

A single negative review does not necessarily mean the company is bad. Many similar complaints about delays, unexpected extras or poor communication are more serious.

Also be wary of a profile with many very short top-rated reviews published within an unusually short period.

8. Ask for a site visit for larger jobs

Photos and descriptions may be enough for a small job. For bathrooms, kitchens, extensive renovations, roofs, facades or structural work, the tradesperson should normally come for a site visit.

During the site visit, you should discuss:

  • The scope of work
  • Existing structures
  • Access and parking
  • Storage of materials
  • Demolition and waste
  • The need for other trades
  • Possible hidden problems
  • Protection of the home
  • Working hours and noise
  • Schedule
  • Documentation
  • Payment plan

Send a written summary after the site visit. That lets the tradesperson correct any misunderstandings before the quote is drawn up.

9. Compare more than the total

A quote of 150,000 kr can be better than a quote of 120,000 kr if the first one includes more work, better materials and more of the necessary services.

Use this overview when you compare:

What to compareQuote 1Quote 2Quote 3
Work description
Fixed price or price estimate
Materials included
Product names and quality
Demolition included
Waste and removal
Electrician and plumber
Covering and cleaning
Start date
Completion
Final documentation
Payment plan
Total price including VAT

If an item is missing, ask for written clarification before you choose.

10. Find out who is responsible

In larger renovations, several companies are often involved. You should know whether you are signing an agreement with one main contractor or separate agreements with each trade.

One main contractor

The main contractor normally coordinates the other trades and gives you a single point of contact. This can make the project easier to follow up, but you should know which tasks are outsourced.

Separate agreements

You hire the carpenter, electrician, plumber and painter yourself. This can give you more control, but also makes you more responsible for coordination and progress.

Clarify in writing:

  • Who is managing the project
  • Who is hiring the subcontractors
  • Who you will pay
  • Who is responsible for delays
  • Who documents the different trades
  • Who corrects any faults
  • Whether the subcontractors are included in the quote

11. Assess the communication before you decide

The communication before the agreement often gives an indication of how the collaboration will go.

Positive signs can be that the tradesperson:

  • Shows up at the agreed time
  • Asks relevant questions
  • Explains possible challenges
  • Sends an understandable quote
  • Gives specific answers
  • Distinguishes between included work and extras
  • Is honest about capacity and schedule
  • Documents verbal agreements
  • Does not promise more than the company can control

Be careful if the tradesperson keeps changing their explanation, avoids written answers or pressures you to decide immediately.

A skilled professional does not need to be a good salesperson. But they should be able to explain the work, the price and the responsibilities in a way you understand.

12. Always use a written contract

Verbal agreements can be binding, but are hard to prove. So use a written contract - even when the tradesperson was recommended by someone you know.

The contract should include:

  • Contact details for the customer and the company
  • Organisation number
  • The address where the work will be carried out
  • Detailed work description
  • Drawings and attachments
  • Chosen materials and products
  • Fixed price, price estimate or hourly rate
  • VAT
  • Start and completion dates
  • Payment plan
  • Responsibility for permit applications
  • Responsibility for waste
  • Responsibility for ordering materials
  • Use of subcontractors
  • What documentation will be delivered
  • How changes are to be ordered
  • How delays and disagreements are to be handled

The Norwegian Consumer Council (Forbrukerrådet) recommends a precise job description, several quotes and a written contract. See their checklist before you choose a tradesperson.

13. Agree on how changes will be handled

Many disputes start with small verbal changes:

"Could you move that wall a little?"

"Could you also replace the trim?"

"We chose a different tile."

Every change can affect both price and schedule. So agree that additional work must be approved in writing before it is carried out.

A change order should describe:

  • What is being changed
  • Why it is being changed
  • The additional price
  • Any material costs
  • The effect on completion
  • Who approved the change

Do not base a large project on ongoing verbal agreements.

14. Do not pay the full amount up front

For larger projects, payment should follow progress.

A payment plan could, for example, look like this:

  • The agreement and work description are signed.
  • The necessary materials are secured.
  • The first instalment is paid when demolition or groundwork is finished.
  • The next instalment is paid when an agreed construction stage is documented.
  • The final amount is paid after the final inspection and receipt of documentation.

A limited advance for custom-ordered materials can be reasonable. In that case, ask for documentation of what the money will be used for, who owns the materials and what happens if the project is cancelled.

The Norwegian Tax Administration (Skatteetaten) recommends paying for services through a bank. If you pay more than 10,000 kr in cash, you risk being held jointly liable if the supplier fails to pay taxes and duties. See the advice from the Norwegian Tax Administration.

15. Agree on the final documentation before work starts

Do not wait until the last day to ask about documentation.

Depending on the project, you may need:

  • Signed contract
  • Change orders
  • Invoices and payment confirmations
  • Product names and serial numbers
  • Colour and material codes
  • Photos of concealed structures
  • Documentation of the membrane and floor gradient
  • Declaration of conformity for electrical work
  • Circuit schedule and final inspection report
  • Operation and maintenance (FDV) documentation
  • Guarantees
  • Use and maintenance instructions
  • Pressure test or other documentation of plumbing work
  • Documentation for the home file (boligmappen)
  • Certificate of completion (ferdigattest) for work that requires a building permit

The documentation can matter for maintenance, insurance claims, complaints and a later sale of the home.

Red flags you should take seriously

No single factor proves that a company is disreputable. Several warning signs at once, however, should make you pause.

Be particularly careful if the tradesperson:

  • Will not provide an organisation number
  • Demands payment to a different person or company
  • Wants a large cash sum
  • Demands full payment before the work starts
  • Will not use a written contract
  • Gives a very low price without a site visit or questions
  • Does not specify what the quote includes
  • Cannot explain who will carry out the work
  • Avoids questions about trade qualifications
  • Will not provide references
  • Promises to start a large project immediately without any planning
  • Wants the customer to buy materials without a written materials list
  • Suggests skipping the invoice to reduce the price
  • Cannot explain the necessary documentation
  • Pressures you to decide the same day
  • Changes the price or terms verbally
  • Asks you to apply to the municipality with incorrect information

A quote that is significantly lower than all the others should be examined extra carefully. The difference may be because work, materials, VAT or necessary trades are not included.

Fixed price, price estimate or hourly rate?

Fixed price

A fixed price gives good predictability when the job is clearly defined. Check that all the necessary parts of the project are included.

Price estimate

A price estimate is an estimate. Under the Consumer Craftsman Services Act (håndverkertjenesteloven), the final price should normally not exceed the estimate significantly, and not by more than 15 percent, unless something else has been expressly agreed or the customer has approved extras.

This does not mean the tradesperson can automatically add 15 percent to every price estimate.

Hourly rate

An hourly rate can be right when the scope of work is uncertain. Agree on:

  • Hourly rate including VAT
  • Expected number of hours
  • How travel time is invoiced
  • Price for the service vehicle
  • Mark-up on materials
  • Minimum billing
  • How often timesheets are provided
  • A cost ceiling that requires new approval

Ask for ongoing updates if the work is approaching the expected budget.

What does it mean that a tradesperson is "quality-assured"?

Quality assurance can mean different things with different operators. It is therefore important to find out what is actually checked.

A check may include, among other things:

  • Organisation number
  • Registered business
  • Contact details
  • Identity
  • Trade qualifications
  • Permits and certificates
  • VAT registration
  • Insurance
  • Customer reviews
  • Payment details

No advance check can guarantee that future work will be flawless. The customer should still use a clear contract, document the project and follow up the work.

The safest solution combines checking the company with a written agreement, documented progress and a secure payment process.

How Fikso can make the process safer

On Fikso, the customer can find service providers, describe the job and keep all communication about the project in one place.

Fikso is built with a particular focus on payment security:

  • The customer and the service provider agree on the job, price and terms.
  • The customer secures the payment before the work starts.
  • The work is documented and followed up through the agreed process.
  • The money is paid out in line with what the parties have agreed.
  • If a disagreement arises, the payment can be withheld while the documentation is reviewed.

A secure payment process does not replace the need for a good work description. But it can reduce the risk, since the full amount is not paid directly to the tradesperson before the work has been delivered and followed up.

Checklist before you choose

Use this list before you sign:

The company

  • I have checked the organisation number.
  • The name matches on the quote, contract and payment details.
  • I have checked the relevant public registers.
  • I know who will actually carry out the work.
  • I have asked about subcontractors.
  • I have checked the relevant qualifications.
  • I have checked insurance where relevant.

The experience

  • The company has experience with similar projects.
  • I have seen examples of previous work.
  • I have checked references.
  • I have read reviews critically.

The quote

  • The scope of work is clear.
  • Materials and products are specified.
  • The price includes VAT.
  • Demolition and waste are clarified.
  • Other trades are clarified.
  • Start and completion dates are stated.
  • The documentation I will receive is described.

The agreement

  • We have a written contract.
  • Changes must be approved in writing.
  • Payment follows milestones.
  • I am not paying the full amount up front.
  • I know who is responsible for faults or delays.
  • A final inspection has been agreed.

Frequently asked questions about choosing a tradesperson

How do I find a reputable tradesperson?

Start by checking the organisation number, relevant qualifications, public registers, references and previous projects. Then ask for a detailed written quote and use a contract.

How many quotes should I get?

Three quotes are often a good starting point. For large or complicated projects, you can contact more companies to get at least three comparable quotes.

Should I always choose the cheapest quote?

No. The cheapest quote may be missing materials, documentation, waste handling or necessary trades. Compare the content before you compare the total.

How do I check a tradesperson's company?

Search by name or organisation number in the Brønnøysund Register Centre's business register. Check that the company is active and that the details match the quote and the invoice.

How do I check an electrician?

The business carrying out the work must be listed with active status in DSB's Register of Electrical Contractors. After the work, you should receive the necessary documentation, including a declaration of conformity.

Is central approval necessary?

Central approval (sentral godkjenning) is voluntary. It can be relevant for building work that requires a permit, but a company can have the necessary qualifications without central approval.

Is a master craftsman certificate necessary?

Not for every job. A master craftsman certificate (mesterbrev) documents further professional and business qualifications, but does not replace the need to check experience, the quote and the contract.

Can I trust reviews?

Reviews are useful as part of the assessment, but should be combined with register checks, references and documented experience.

Should the tradesperson have liability insurance?

For larger or higher-risk jobs, you should ask about relevant liability insurance. Ask for confirmation of what the insurance covers.

How much should I pay up front?

You should normally not pay for the whole project up front. A limited amount for documented special-order materials can be reasonable, while the rest should follow agreed milestones.

What should a contract with a tradesperson include?

The contract should describe the scope of work, materials, price, VAT, schedule, payment plan, documentation, subcontractors and how extras are handled.

What do I do if the price goes up?

Ask for a written explanation and documentation. Additional work should be approved before it is carried out. A price estimate can normally not be exceeded by more than 15 percent without specific grounds or an agreement.

Can I pay in cash?

Paying through a bank or a traceable payment solution is safer. With cash payments over 10,000 kr, the customer risks being held jointly liable for unpaid taxes and duties.

What do I do if the work has faults?

Make a complaint in writing as soon as possible, document the fault and give the tradesperson the opportunity to inspect and correct it. Do not order repairs from others before the original company has had a reasonable opportunity to deal with the defect.

How long do I have to make a complaint?

For work on real property, the complaint period can be five years. You must still give notice within a reasonable time after you discovered or should have discovered the fault.

Conclusion: The best tradesperson is not always the cheapest

A reputable tradesperson should be able to document who the company is, what qualifications it has, what the work costs and what you will get delivered.

Before you decide, you should:

  • Check the company in the relevant registers
  • Look into experience and references
  • Compare several detailed quotes
  • Clarify responsibilities and subcontractors
  • Use a written contract
  • Approve extras in writing
  • Pay according to documented progress
  • Require the right final documentation

The goal is not to find the tradesperson who promises the most or starts the fastest. The goal is to find a company that understands the job, communicates clearly and can document that the work is carried out in a safe and professionally sound way.

Method and sources

This article is based on information and guidance from Norwegian public authorities and consumer organisations. Rules and register schemes can change, and the customer should check the current requirements for their specific project.

Sources used as a basis:

Ready to find a tradesperson?

Describe your job, compare quotes and pay securely through Fikso.

Find a tradesperson

Free to use · No hidden fees · Payout only after approval

How to choose the right tradesperson: 15 tips before you decide | Fikso