A simple surface renovation of an apartment usually costs around 2,500-5,000 kr per square metre. A full renovation often costs between 8,000 and 25,000 kr per square metre.

For a 70 square metre apartment, that means roughly:

The price does not depend only on the size of the apartment. The bathroom, kitchen, electrical system, pipes, floor plan and choice of materials often matter more than the number of square metres.

All prices in this article are indicative and include VAT unless otherwise stated.

In short

  • A surface renovation costs roughly 2,500-5,000 kr per m².
  • A medium-scale renovation often costs 6,000-12,000 kr per m².
  • A full renovation usually costs 12,000-25,000 kr per m².
  • The average for a full renovation is around 14,000 kr per m².
  • Renovating a 50 m² apartment can cost from 125,000 kr to over 1.2 million kr.
  • Renovating a 70 m² apartment can cost from 175,000 kr to over 1.7 million kr.
  • A new kitchen often costs 75,000-300,000 kr.
  • A fully renovated bathroom usually costs 200,000-400,000 kr or more.
  • You should set aside a contingency of at least 10-15 percent.
  • A simple renovation normally does not require a building application, but load-bearing walls, changes of use and work that affects other units may require one.

Price per square metre

Type of renovationIndicative price per m²
Simple cosmetic renovation2,500-5,000 kr
Medium-scale renovation6,000-12,000 kr
Full renovation12,000-25,000 kr
High-end full renovation25,000-35,000 kr or more

The price per square metre is useful in early planning, but it cannot replace a detailed quote.

A bathroom costs about the same to fully renovate whether the apartment is 40 or 80 square metres. Small apartments with a new bathroom and kitchen can therefore end up with a higher price per square metre than large apartments.

What do the different levels mean?

Simple surface renovation

A surface renovation changes the look without major intervention in the structure or the technical systems.

This can include:

  • Painting walls and ceilings
  • Filling minor damage
  • Laying laminate or parquet
  • New skirting boards
  • Painting or replacing interior doors
  • New handles and fittings
  • Simple lighting
  • Upgrading kitchen fronts
  • Minor cosmetic work in the bathroom

You normally keep the existing floor plan, kitchen, bathroom, pipes and most of the electrical system.

Medium-scale renovation

A medium renovation goes further than new surfaces, but it is not necessarily a complete full renovation.

This can include:

  • New floors throughout the apartment
  • Full filling and painting
  • New kitchen
  • More electrical points
  • New interior doors
  • Minor changes to the floor plan
  • Upgrading parts of the plumbing
  • Upgrading one or more rooms
  • New wardrobes or built-in fittings

The bathroom can be kept if it is in good technical condition. This is often what separates a medium renovation from a costly full renovation.

Full renovation

In a full renovation, large parts of the apartment are upgraded, often right down to the substrate.

The work can include:

  • Demolition and waste handling
  • Changing the floor plan
  • New walls and ceilings
  • New electrical system
  • New water and drainage pipes
  • Full bathroom renovation
  • New kitchen
  • New floors
  • New doors
  • Filling and painting
  • Ventilation
  • Built-in fittings
  • Final documentation

A full renovation usually involves a carpenter, painter, electrician, plumber, tiler and project manager.

What does it cost to renovate different sizes?

SizeSurface renovationMedium renovationFull renovation
30 m²75,000-150,000 kr180,000-360,000 kr360,000-750,000 kr
50 m²125,000-250,000 kr300,000-600,000 kr600,000-1,250,000 kr
70 m²175,000-350,000 kr420,000-840,000 kr840,000-1,750,000 kr
90 m²225,000-450,000 kr540,000-1,080,000 kr1,080,000-2,250,000 kr
120 m²300,000-600,000 kr720,000-1,440,000 kr1,440,000-3,000,000 kr

The ranges are wide because two apartments of the same size can have completely different needs.

A 70 square metre apartment with a newer bathroom can be far cheaper to renovate than a 50 square metre apartment where the bathroom, kitchen, pipes and electrical system all have to be replaced.

Common costs when renovating an apartment

WorkIndicative price
Demolition, site setup and waste30,000-120,000 kr
Filling and painting60,000-200,000 kr
New floors50,000-200,000 kr
New kitchen75,000-300,000 kr
Full bathroom renovation200,000-400,000 kr or more
Electrical work30,000-200,000 kr
Plumbing work20,000-100,000 kr
New walls and carpentry50,000-250,000 kr
New interior doors8,000-30,000 kr per door
Architect or interior architect20,000-150,000 kr
Project managementDepends on the project and agreement
Building application and design work20,000-100,000 kr or more

The costs can overlap. In a quote from a main contractor, for example, project management, site setup and coordination will often be spread across several items or combined in one price.

What does it cost to paint an apartment?

Professional filling and painting of an apartment often costs between 60,000 and 200,000 kr.

The price is affected by:

  • The size of the apartment
  • The number of rooms
  • Ceiling height
  • The condition of the walls
  • Whether full skim coating is needed
  • The number of colours
  • Painting ceilings, skirting boards and doors
  • Whether the apartment is furnished
  • The need for covering and moving furniture

Painting directly onto smooth walls is far cheaper than fully skim coating old walls with hessian, wallpaper or major damage.

If you want perfectly smooth walls and ceilings, the preparation work can make up most of the cost.

What does it cost to lay new flooring?

New flooring in an apartment often costs between 50,000 and 200,000 kr including materials, installation and skirting boards.

Standard parquet typically costs from around 400 to 2,000 kr per square metre for the material alone. Labour, underlay, removal and levelling come on top.

The price depends on:

  • Type of flooring
  • Quality and pattern
  • Whether the old flooring has to be removed
  • The condition of the subfloor
  • The need for levelling
  • The number of rooms and thresholds
  • New skirting boards
  • Waste handling

Herringbone parquet, solid wood and special patterns are more expensive to lay than standard laminate or click parquet.

If the old floor is uneven, levelling can be a significant additional cost.

What does it cost to renovate the kitchen?

A new or extensively upgraded kitchen usually costs between 75,000 and 300,000 kr. A typical kitchen project is often around 150,000 kr.

The price can include:

  • Kitchen cabinets and fronts
  • Worktop
  • Appliances
  • Dismantling
  • Installation
  • Electrician
  • Plumber
  • Kitchen lighting
  • Extractor hood
  • Tiles or a splashback panel above the worktop
  • Painting and adjustments

You can save a lot by keeping the kitchen where it is. If the sink, dishwasher, cooker and extractor hood are moved, new pipes, drainage, electrical circuits and ventilation may be needed.

A cosmetic kitchen upgrade can cost far less. New fronts, handles, a worktop and paint can give a clear lift without replacing the whole kitchen.

Ready to find a tradesperson?

Describe your job, compare quotes and pay securely through Fikso.

Find a tradesperson

Free to use · No hidden fees · Payout only after approval

What does it cost to renovate the bathroom?

A full bathroom renovation usually costs between 200,000 and 400,000 kr. Large bathrooms, high-end products or complicated solutions can cost 500,000 kr or more.

A typical bathroom project includes:

  • Demolition
  • Waste handling
  • Plumber
  • Electrician
  • Carpentry
  • Floor drain and drainage
  • Waterproofing membrane
  • Tiling
  • Underfloor heating cables
  • Lighting
  • Ventilation
  • Toilet
  • Washbasin and furniture
  • Shower or bathtub
  • Documentation

The bathroom is often the most expensive part of an apartment renovation. Even a small bathroom requires many of the same trades and work steps as a larger one.

If the bathroom is in good technical condition, you can save a lot by keeping it and doing a simpler cosmetic upgrade.

What does the electrical work cost?

Electrical work when renovating an apartment can cost from around 30,000 kr to over 200,000 kr.

A smaller project can include:

  • New sockets
  • New switches and dimmers
  • Installing lighting
  • Inspection of the existing system
  • A few new circuits

A larger electrical upgrade can include:

  • New fuse box
  • New cabling
  • New circuits
  • Electrical points in every room
  • Kitchen and bathroom
  • Underfloor heating
  • Smart home solutions
  • Full documentation

Work on the fixed electrical installation must be carried out and documented by a registered electrical contractor.

Ask for a declaration of conformity (samsvarserklæring) once the work is finished.

What does the plumbing work cost?

Plumbing work can cost between 20,000 and 100,000 kr or more, depending on the scope.

It becomes particularly expensive if:

  • The kitchen is moved
  • The bathroom is fully renovated
  • Drains have to be moved
  • A laundry room is added
  • Old pipes have to be replaced
  • The work affects shared pipe risers
  • Floors or walls have to be opened up

Keep wet rooms and the kitchen close to the existing water and drainage runs where possible. Long new pipe runs can be expensive and technically difficult to carry out in an apartment.

Example 1: Surface renovation of 50 m²

The apartment is getting new floors, painted walls and ceilings, new skirting boards and some minor electrical upgrades. The bathroom and kitchen are kept.

CostIndicative price
Filling and painting70,000 kr
Flooring and installation65,000 kr
Skirting boards and minor carpentry20,000 kr
Electrician15,000 kr
Site setup and waste15,000 kr
Total price185,000 kr

That is roughly 3,700 kr per square metre.

Example 2: Medium renovation of 70 m²

The apartment is getting a new kitchen, new floors, fully skim-coated walls, more electrical points and some minor changes to the floor plan. The bathroom is kept.

CostIndicative price
Demolition and waste40,000 kr
New kitchen160,000 kr
Electrician70,000 kr
Plumber25,000 kr
Flooring100,000 kr
Filling and painting120,000 kr
Carpentry and doors80,000 kr
Total price595,000 kr

That is roughly 8,500 kr per square metre.

Example 3: Full renovation of 80 m²

The apartment is getting a new bathroom and kitchen, a changed floor plan, a new electrical system, upgraded pipes, new floors and new surfaces.

CostIndicative price
Demolition, site setup and waste70,000 kr
Bathroom275,000 kr
Kitchen175,000 kr
Electrician150,000 kr
Plumber outside the bathroom50,000 kr
Carpentry140,000 kr
Flooring90,000 kr
Filling and painting110,000 kr
Project management and documentation70,000 kr
Total price1,130,000 kr

That is roughly 14,125 kr per square metre.

The example shows why the bathroom and kitchen matter so much for the overall price.

What affects the price most?

Bathroom and kitchen

Wet rooms and kitchens require several trades, expensive equipment and technical installations. These are usually the largest cost items.

Changing the floor plan

Moving walls can affect floors, ceilings, electrical cables, ventilation and pipes. If the wall is load-bearing, the project becomes more complicated and may require a building application.

Moving water and drainage

Moving the kitchen or bathroom can require new pipe runs through floors, walls or shared structures.

The age of the apartment

Older apartments can have:

  • Old electrical systems
  • Uneven floors
  • Worn pipes
  • Crooked walls
  • Unknown structures
  • Hazardous materials
  • Poor ventilation
  • Incomplete documentation

This increases the risk of unforeseen costs.

Choice of materials

The price difference between affordable standard products and custom-made solutions can be very large.

Kitchens, parquet, tiles, bathroom fixtures and doors come in almost every price range.

Access and floor level

Apartments can be more demanding to renovate than detached houses. Materials and waste have to be carried through the stairwell or lift, and there may be restrictions on working hours and parking.

Number of trades

The more trades involved, the more important coordination becomes. Waiting time and work done in the wrong order can increase the cost.

Where you live

Price levels are often higher in Oslo and other large cities. Local competition, travel distance and demand affect prices.

How long does it take?

Type of renovationTypical duration
Simple surface renovation1-3 weeks
Medium renovation4-8 weeks
Full renovation8-16 weeks
Extensive project requiring an application4-8 months or more

The duration is affected by the size of the project, product lead times, the number of tradespeople and any applications.

Bathrooms and custom-ordered kitchens can have long lead times. Order critical products before the project starts.

Also remember to budget for alternative accommodation if the apartment cannot be used during the work.

In what order should the work be done?

A typical full renovation is carried out like this:

  • Planning and budget
  • Drawings and choice of solutions
  • Clarification with the board and the municipality
  • Obtaining quotes
  • Contract and schedule
  • Ordering products
  • Demolition and waste handling
  • Carpentry and new walls
  • Rough-in for plumbing and electrics
  • Bathroom, waterproofing membrane and tiles
  • Walls, ceilings and painting
  • Floors
  • Kitchen installation
  • Final electrical and plumbing work
  • Inspection, documentation and handover

The order can vary. What matters is that the trades plan the work together before the project starts.

Do you need to apply to the municipality?

Ordinary maintenance and cosmetic renovation normally do not require a building application.

According to the Norwegian Building Authority (Direktoratet for byggkvalitet), you can as a general rule do the following without applying to the municipality:

  • Paint and renovate surfaces
  • Replace flooring
  • Renovate an existing bathroom when the work does not affect other units
  • Put up or remove a non-load-bearing partition wall
  • Make certain minor changes to the plumbing

You may have to apply if you are going to:

  • Alter a load-bearing wall or column
  • Breach a fire barrier
  • Do bathroom work that affects several units or fire compartments
  • Convert a storage room into a bedroom or other living space
  • Divide the apartment into several units
  • Make changes to the facade
  • Move or alter escape routes
  • Carry out a conversion so extensive that it counts as a major reconstruction (hovedombygging)

A non-load-bearing partition wall can normally be moved without an application if the work takes place within the same fire compartment and the requirements for light, ventilation and fire safety are still met.

If you are unsure, contact the municipality before the work starts.

Does the board of the co-owned property or housing cooperative need to approve the renovation?

Permission from the municipality and permission from the co-owned property (sameie) or housing cooperative (borettslag) are two different things.

Even if the work does not require a building application, the bylaws and house rules may require that the board is notified or approves the work.

Contact the board if the project affects:

  • Load-bearing walls
  • Shared pipe risers
  • Ventilation systems
  • Floor drains and floor slabs
  • Fire barriers
  • Facade or windows
  • Balcony
  • Shared electrical installations
  • Shutting off the water
  • Transport through common areas
  • Construction waste
  • Prolonged noise

Also agree on working hours, use of the lift and protection of the stairwell and common areas.

Ask for written approval when this is required.

Which tradespeople do you need?

A full renovation can require:

  • Carpenter
  • Painter
  • Floor layer
  • Electrician
  • Plumber
  • Tiler
  • Waterproofing specialist
  • Ventilation company
  • Architect
  • Structural engineer
  • Project manager

You can sign separate agreements with each company or choose a main contractor who coordinates the whole project.

Separate agreements can give you more control over prices, but require you to manage progress, dependencies and the division of responsibility yourself.

A main contractor may cost more, but you normally get one contract and one party with overall responsibility.

What documentation should you receive?

The documentation should be collected digitally and stay with the apartment.

Ask for:

  • Contract and quote
  • Change orders and approved extras
  • Invoices
  • Photos of concealed structures
  • Declaration of conformity from the electrician
  • Documentation of the plumbing work
  • Pressure testing where relevant
  • Waterproofing membrane documentation
  • Product documentation
  • Operation and maintenance (FDV) documentation
  • Updated circuit list
  • Building application and permits
  • Approval from the board
  • Warranties
  • Handover report

The documentation is important when selling the home, making a complaint, dealing with an insurance claim and for later renovations.

Ask for the documentation to be registered in Boligmappa.

How large a contingency should you have?

Set aside at least 10-15 percent of the budget as a contingency.

When renovating older apartments, 15-20 percent may be sensible.

If the project budget is 1,000,000 kr, you should therefore have between 100,000 and 200,000 kr available for unforeseen costs.

Common surprises are:

  • Uneven floors
  • Damp or rot
  • Old pipes
  • Illegal electrical installations
  • Poor sound insulation
  • Asbestos or other hazardous materials
  • Extra work behind walls and ceilings
  • Delayed deliveries
  • Changes the customer orders along the way

The contingency should not be spent on planned upgrades. It should be available if something unforeseen actually comes up.

How to save money

Keep the bathroom if it is technically sound

The bathroom is often the most expensive part of the apartment. If the bathroom is documented and in good condition, you can settle for cosmetic changes.

Do not move the kitchen

Keeping the sink and dishwasher close to the existing water supply and drainage can save significant amounts.

Keep the floor plan

Fewer changes to walls means less work on floors, ceilings, electrics and ventilation.

Choose standard sizes

Standard kitchen cabinets, doors and fittings are often cheaper than custom-made solutions.

Decide on materials early

Changes along the way create extra work, delays and new orders.

Reuse what works

Parquet can be sanded, kitchen fronts can be painted, and some doors and skirting boards can be kept.

Compare complete quotes

A low quote may be missing important costs. Compare the scope of work, materials, documentation and reservations - not just the total.

Clearing, painting, simple demolition and waste handling can reduce the cost. Always clarify responsibility with the tradespeople before doing parts of the work yourself.

Do not carry out electrical work, work on water pipes or risky work in wet rooms without the right qualifications.

How to get good quotes

Write one detailed job description that all the companies receive.

It should contain:

  • Address and the size of the apartment
  • Year of construction
  • Floor plan drawing
  • Photos
  • Description of the current condition
  • The work to be carried out
  • Products and material standard
  • Which walls are to be moved
  • Whether the bathroom and kitchen are to be kept or moved
  • Desired start and completion dates
  • Documentation requirements
  • Responsibility for waste and cleaning
  • Information about the lift, parking and working hours

Ask for the quote to be broken down into:

  • Demolition and site setup
  • Carpentry
  • Painting
  • Flooring
  • Electrician
  • Plumber
  • Bathroom
  • Kitchen
  • Materials
  • Project management
  • Documentation
  • Waste
  • Additional work

That makes it easier to spot if something is missing.

Contract and secure payment

The contract should describe:

  • The exact scope of work
  • Price or price estimate
  • Start and completion dates
  • Schedule
  • Payment plan
  • Materials and products
  • Division of responsibility
  • Documentation requirements
  • How additional work is to be approved
  • What happens in the event of delay
  • How faults and defects are to be handled

According to the Norwegian Consumer Council (Forbrukerrådet), a price estimate may as a general rule not be exceeded by more than 15 percent unless something else has been expressly agreed.

For larger projects, payment should be split according to progress. Avoid paying the full amount before the work has been inspected and the documentation received.

Fikso is built to make the renovation process safer. The customer secures the payment before the work starts, and the money is paid out in line with the agreed process. If a disagreement arises, the payment can be held back while the parties' documentation is reviewed.

Handover of the finished apartment

Do not approve the project without a thorough inspection.

Check:

  • Walls and ceilings in good light
  • Floors, joints and skirting boards
  • Doors and handles
  • Kitchen cabinets and drawers
  • Water pressure and drainage
  • Toilet, shower and mixer taps
  • Sockets and switches
  • Lighting and dimmers
  • Ventilation
  • Grout, seals and transitions
  • Visible damage
  • Cleaning
  • The agreed documentation

Record all faults and outstanding work in a handover report. Take photos and set a deadline for rectification.

Frequently asked questions

What does it cost to renovate an apartment per square metre?

A surface renovation usually costs 2,500-5,000 kr per square metre. A full renovation often costs 12,000-25,000 kr per square metre.

What does it cost to renovate a 50 m² apartment?

A surface renovation often costs 125,000-250,000 kr. A full renovation can cost between 600,000 and 1,250,000 kr.

What does it cost to renovate a 70 m² apartment?

A surface renovation costs roughly 175,000-350,000 kr. A full renovation usually costs between 840,000 and 1,750,000 kr.

What does a full apartment renovation cost?

A full renovation often costs between 12,000 and 25,000 kr per square metre. The average is around 14,000 kr per square metre, but the bathroom, kitchen and technical upgrades can push the price up.

What is the most expensive part of the renovation?

The bathroom is often the most expensive single item. It is typically followed by the kitchen, the electrical system, plumbing work and extensive changes to the floor plan.

How long does a full apartment renovation take?

A typical full renovation often takes between 8 and 16 weeks. Applications, special products or complicated structures can extend the project.

Can I live in the apartment while it is being renovated?

With painting and a simple surface renovation it may be possible. With a full renovation involving demolition, dust, the water shut off and no kitchen or bathroom, you should normally find somewhere else to live.

Do I need to apply to move a wall?

A non-load-bearing partition wall can normally be moved without an application as long as fire safety, ventilation and other requirements are maintained. Intervention in a load-bearing wall or fire barrier normally requires an application.

Do I need permission from the board?

It depends on the bylaws and the work. You should contact the board if the project affects shared pipes, ventilation, load-bearing structures, fire barriers, the facade or common areas.

How much should I set aside for unforeseen costs?

Set aside at least 10-15 percent. For older apartments or complicated projects, 15-20 percent may be more realistic.

How long can I complain about the work?

The Norwegian Consumer Council (Forbrukerrådet) states that tradespeople's work on real property normally has a five-year complaint period. You must still complain as soon as possible after discovering the fault.

Conclusion: What should you budget for?

A simple renovation of the apartment typically costs between 2,500 and 5,000 kr per square metre. If the whole apartment is to be fully renovated, you should normally expect 12,000-25,000 kr per square metre.

A realistic budget could be:

  • 50 m² surface renovation: 125,000-250,000 kr
  • 50 m² full renovation: 600,000-1,250,000 kr
  • 70 m² surface renovation: 175,000-350,000 kr
  • 70 m² full renovation: 840,000-1,750,000 kr
  • 90 m² full renovation: 1,080,000-2,250,000 kr

The most important thing is to define what "renovation" means in your project. Painting and new floors are something entirely different from a new bathroom, kitchen, pipes, electrical system and a changed floor plan.

Write a detailed description, obtain comparable quotes and keep a contingency. That reduces the risk of the project ending up far more expensive than planned.

Method and sources

The prices are indicative estimates based on published price databases and price guides for Norwegian renovation projects. The actual price depends on location, condition, standard, materials and scope of work.

Rules and price information have been checked against:

This article provides general information and does not replace a site visit, professional design work or a specific quote.

Ready to find a tradesperson?

Describe your job, compare quotes and pay securely through Fikso.

Find a tradesperson

Free to use · No hidden fees · Payout only after approval

What does it cost to renovate an apartment in 2026? | Fikso